Skip to main content
Loading…
This section is included in your selections.

A. All grantees are required to cooperate with the city and with each other.

B. Each grantee shall meet with the city, other grantees and users of the rights-of-way annually or as determined by the city to schedule and coordinate construction in rights-of-way.

C. All construction locations, activities, and schedules shall be coordinated, as ordered by the director, to minimize public inconvenience, disruption, or damages. (Ord. 1188-21 § 2 (Exh. A), 2021).