Skip to main content
Loading…
This section is included in your selections.

A. If any connection to a public sewer is not made within the time and in the manner provided in Sections 13.10.040 through 13.10.060, the city council may cause the same to be made.

B. If any needed repair to a building sewer or connection to a public sewer is not made within the time and in the manner provided in Sections 13.10.040 through 13.10.060, the utility superintendent may cause the same to be made and file a statement of the cost thereof with the city clerk.

C. The city clerk shall file a declaration of lien with the county auditor. Upon such filing the cost together with interest at eight and one-half percent per annum shall become a lien against the property. (Ord. 947-04 § 2).