As used in this chapter, unless the context otherwise requires:

A. “Extra capacity facilities” includes but is not limited to:

1. For water, participation in pump stations, standby generators, reservoirs, and large transmission lines needed to improve fire flow and pressure;

2. For sewers, participation in lift stations, force mains, large trunk lines needed to improve capacity or eliminate a storm and sanitary sewer cross-connection;

3. For storm water management, this charge is deemed necessary to fund improvements of all existing and future storm water management and surface water runoff facilities.

B. “Utility systems development charge” is, for the purpose of collection, a portion of the costs of increasing the capacity of sewer, water and storm water management facilities upon properties located within and without the city which create need for those facilities. (Ord. 947-04 § 2).