A. Building Permits.
Total Valuation |
Fee |
---|---|
$1.00 to $500.00 |
$25.25 |
$501.00 to $2,000 |
$25.25 for the first $500.00 plus $3.30 for each additional $100.00, or fraction thereof, to and including $2,000 |
$2,001 to $25,000 |
$81.15 for the first $2,000 plus $14.95 for each additional $1,000, or fraction thereof, to and including $25,000 |
$25,001 to $50,000 |
$417.75 for the first $25,000 plus $10.80 for each additional $1,000, or fraction thereof, to and including $50,000 |
$50,001 to $100,000 |
$687.00 for the first $50,000 plus $7.50 for each additional $1,000 or fraction thereof, to and including $100,000 |
$100,001 to $500,000 |
$1,061.50 for the first $100,000 plus $6.00 for each additional $1,000, or fraction thereof, to and including $500,000 |
$500,001 to $1,000,000 |
$3,453.25 for the first $500,000 plus $5.10 for each additional $1,000, or fraction thereof, to and including $1,000,000 |
$1,000,001 and up |
$5,889.40 for the first $1,000,001 plus $4.00 for each additional $1,000 or fraction thereof |
Plan Review Fees |
65% of the building permit fee |
B. Mechanical Permit Fees.
Permit Issuance |
Fee |
|
---|---|---|
1. |
For the issuance of each mechanical permit |
$21.40 |
2. |
For issuing each supplemental permit for which the original permit has not expired, been canceled or finaled |
$10.70 |
Unit Fee Schedule |
||
1. |
Furnaces |
$15.80 |
For the installation or relocation of forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h (29.3 kW) |
$19.60 |
|
For the installation or relocation of each floor furnace, including vent |
$15.80 |
|
For the installation or relocation of each suspended heater, recessed wall heater or floor mounted unit heater |
$15.80 |
|
2. |
Appliance Vents |
$7.65 |
3. |
Repairs or Additions |
$14.75 |
4. |
Boilers, Compressors and Absorption Systems |
$15.80 |
For the installation or relocation of each boiler or compressor over 3 horsepower (10.6 kW) to and including 15 horsepower (52.7 kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6 kW) |
$29.00 |
|
For the installation or relocation of each boiler or compressor over 15 horsepower (52.7 kW) to and including 30 horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (1,466 kW) to and including 1,000,000 Btu/h (291.3 kW) |
$39.95 |
|
For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 kW) to and including 50 horsepower (176 kW), or each absorption system over 1,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) |
$59.25 |
|
For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW) |
$98.55 |
|
5. |
Air Handlers |
$11.45 |
For each air-handling unit over 10,000 cfm (4,719 L/s) |
$19.35 |
|
6. |
Evaporative Coolers |
$11.45 |
7. |
Ventilation and Exhaust |
$7.65 |
For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit |
$11.45 |
|
For the installation of each hood which is served by a mechanical exhaust, including the ducts for each hood |
$11.45 |
|
8. |
Incinerators |
$19.35 |
9. |
Miscellaneous |
$29.00 |
For each gas piping system of one to four outlets |
$5.35 |
|
For each gas piping system with five or more outlets, for each outlet |
$1.30 |
|
When applicable, permit fee for process piping shall be as follows: |
||
For each hazardous process piping system (HPP) of one to four outlets |
$5.60 |
|
For each hazardous process piping system of five or more outlets, for each outlet |
$1.30 |
|
For each non-hazardous process piping system (NPP) of one to four outlets |
$2.15 |
|
For each non-hazardous process piping system of five or more outlets, for each outlet |
$0.55 |
|
For each appliance or piece of equipment regulated by the mechanical code but not classed in other appliance categories or for which no other fee is listed in the table |
$11.45 |
C. Plumbing Permit Fees.
Permit Issuance |
Fee |
|
---|---|---|
1. |
For issuing each permit |
$21.40 |
2. |
For issuing each supplemental permit |
$10.70 |
Unit Fee Schedule |
||
1. |
For each additional plumbing fixture on one trap or a set of fixtures on one trap (including water, drainage piping and backflow protection therefore) |
$7.40 |
2. |
For each building sewer and each trailer park sewer |
$16.05 |
3. |
Rainwater systems – per drain (inside building) |
$7.40 |
4. |
For each private sewage disposal system |
$26.70 |
5. |
For each water heater and/or vent |
$7.40 |
6. |
For each gas piping system of one to five outlets |
$5.35 |
7. |
For each additional gas piping system outlet, per outlet |
$1.30 |
8. |
For each industrial waste pretreatment interceptor including its trap and vent, except kitchen-type grease interceptors functioning as fixture traps |
$7.40 |
9. |
For each installation, alteration or repair or water piping and/or water, each |
$7.40 |
10. |
For each repair or alteration of a drainage or vent piping, each fixture |
$7.40 |
11. |
For each lawn sprinkler system on any one meter including backflow protection devices therefor |
$7.40 |
12. |
For atmospheric-type vacuum breakers not included in item 13: |
|
1 to 5 |
$5.35 |
|
Over 5, each |
$1.30 |
|
13. |
For each backflow protective device other than atmospheric type vacuum breakers: |
|
2 inch (51 mm) diameter and smaller |
$7.40 |
|
Over 2 inch (51 mm) diameter |
$16.05 |
|
14. |
For each gray water system |
$42.75 |
15. |
For initial installation and testing for a reclaimed water system |
$32.05 |
16. |
For each annual cross-connection testing of a reclaimed water system (excluding initial test) |
$32.05 |
17. |
For each medical gas piping system serving one to five inlet(s)/outlet(s) for a specific gas |
$53.40 |
18. |
For each additional medical gas inlet(s)/outlet(s) |
$5.35 |
D. Water extension permits: four hundred ten dollars plus fifty cents per foot.
E. Sanitary sewer permits: one thousand two hundred fifty dollars.
F. Access permits (asphalt street openings): five hundred dollars.
G. Overload permits (legal load is fourteen thousand lbs.):
Amount over 14,000 lbs. |
1 Day |
1 Year |
---|---|---|
14,001 – 32,000 |
$10.00 |
$30.00 |
32,001 – 44,000 |
$10.00 |
$100.00 |
44,001 – 62,000 |
$15.00 |
$150.00 |
62,001 – 86,000 |
$20.00 |
$200.00 |
86,001 – 116,000 |
$30.00 |
$300.00 |
116,001 – 152,000 |
$40.00 |
$400.00 |
152,001 or more |
$50.00 |
$500.00 |
If truck is under legal load limit, no charge or permit is required.
H. Inspection outside of normal business hours (minimum charge: two hours): fifty-one dollars per hour.
I. Reinspection fee: eighty dollars per hour.
J. Inspection for which no fee is specifically indicated (minimum charge: one hour): fifty-one dollars per hour.
K. Additional plan review required by changes, additions or revisions to plans fifty-one dollars per hour or actual cost to the city, whichever is the greatest.
L. Culvert tile permits:
1. First eighty feet or fraction thereof: fifty dollars;
2. Over eighty feet: fifty cents per foot.
M. Demolition permits: two hundred dollars. (One hundred dollars will be refunded after satisfactory inspection. Applies only to structures over one hundred twenty square feet.)
N. Annexation: two hundred fifty dollar filing fee, plus city’s costs.
O. Water service installation:
1. Three-quarter-inch meter: one thousand dollars;
2. One-inch and over meter: actual cost plus fifteen percent, but in no case less than one thousand dollars;
3. Three-quarter-inch meter installation only, with water service installed by the developer, as approved by the city engineer: two hundred dollars;
4. One-inch and over meter installation only, with water service installed by the developer, as approved by the city engineer: actual cost plus fifteen percent, but in no case less than two hundred dollars.
P. Water reconnect: thirty-five dollars between 8:00 a.m. to 4:00 p.m. Monday through Friday.
All other hours: one hundred twenty-five dollars.
Q. Unauthorized turn-on/hook-up of disconnected water service: one hundred fifty dollars.
R. Water shut-off delinquency notice fee: twenty-five dollars.
S. New account setup fee: twenty-five dollars.
T. Hourly planning city staff fee: eighty dollars.
U. Pre-application meeting fee: five hundred dollars. (Ord. 1193-21 § 2, 2021; Ord. 1141-17 § 3; Ord. 955-04 § 2, 2004; Ord. 946-04 § 10).