Skip to main content
Toggle site navigation
Menu
Description
Adopts stormwater criteria in Appendix I of NPDES Phase II municipal stormwater permit; repeals and replaces Ch. 13.46, stormwater management regulations and requirements
Disposition
Codified
Affecting
13.46.010, Findings of fact
(Amended by § 2)
13.46.020, Need
(Amended by § 2)
13.46.030, Purpose
(Amended by § 2)
13.46.050, General provisions
(Amended by § 2)
13.46.060, Applicability
(Amended by § 2)
13.46.070, Regulated activities
(Amended by § 2)
13.46.090, General requirements
(Amended by § 2)
13.46.210, Minimum Requirement No. 1 – Preparation of storm water site plan
(Amended by § 2)
13.46.220, Minimum Requirement No. 2 – Construction storm water pollution prevention plan (SWPPP)
(Amended by § 2)
13.46.295, Financial liability
(Amended by § 2)
13.46.300, Maintenance agreement
(Amended by § 2)
13.46.310, Maintenance responsibility
(Amended by § 2)
13.46.320, Administration
(Amended by § 2)
13.46.330, Review and approval
(Amended by § 2)
13.46.340, Inspection
(Amended by § 2)
13.46.350, Fees
(Amended by § 2)
13.46.360, Enforcement
(Amended by § 2)
13.46.370, Stop work/compliance order
(Amended by § 2)
13.46.380, Violation
(Amended by § 2)
13.46.390, Exceptions/variances
(Amended by § 2)
Previously Affecting
13.46.080, Exemptions
(Amended by § 2)
13.46.100, Approval standards – New development
(Amended by § 2)
13.46.110, Approval standards – Redevelopment
(Amended by § 2)
13.46.230, Minimum Requirement No. 3 – Source control of pollution
(Amended by § 2)
13.46.240, Minimum Requirement No. 4 – Preservation of natural drainage systems and outfalls
(Amended by § 2)
13.46.250, Minimum Requirement No. 5 – On-site storm water management
(Amended by § 2)
13.46.260, Minimum Requirement No. 6 – Runoff treatment
(Amended by § 2)
13.46.270, Minimum Requirement No. 7 – Flow control
(Amended by § 2)
13.46.280, Minimum Requirement No. 8 – Wetlands protection
(Amended by § 2)
13.46.290, Minimum Requirement No. 9 – Operation and maintenance
(Amended by § 2)