22.48.090 Temporary buildings for use during construction.1
This section is included in your selections.
The use of temporary buildings during construction shall not exceed six months. (Ord. 1190-21 § 2, 2021).
1Ord. 1190-21 added two sections numbered 22.48.070. This section has been editorially renumbered from 22.48.080 to accommodate.