Skip to main content
Loading…
This section is included in your selections.

Building sewer permits shall be obtained in the following manner:

A. Building sewer permits shall be issued only upon proper application at the office of the city.

B. A permit which includes building sewer work in a public area may be issued only to a licensed side sewer contractor.

C. A permit which includes building sewer work on private property only may be issued to the owner of the property or to a licensed side sewer contractor.

D. No licensed side sewer contractor shall lay any pipe pursuant to any other person’s permit nor shall any unauthorized person lay any pipe pursuant to a licensed side sewer contractor’s permit.

E. The applicant for a building sewer permit shall supply the director with the following information:

1. Owner’s name;

2. Address to be served;

3. Owner’s mailing address;

4. Name and address to which bills shall be mailed;

5. Licensed side sewer contractor’s name;

6. Legal description of property to be served;

7. All outside dimensions of building to be served;

8. Location of building on property to be served;

9. Purpose of building;

10. Full course of the proposed side sewer.

F. A permit shall be obtained and the fees therefore paid before any side sewer work is started.

G. No permit will be issued for side sewer connection before the main sewer is accepted.

H. The permit card must be posted on the job and must be readily accessible to the inspector for the city.

I. A licensed side sewer contractor shall meet with the inspector on the job whenever so directed. (Ord. 947-04 § 2).